Print Page
Transmission Solutions
Redundancy
Downloads:

Transmission Brochure

Polistream Redundancy Whitepaper

The Polistream subtitle transmission system has been designed to cater for a range of redundancy strategies



Redundancy


The Polistream subtitle transmission system has been designed to cater for a range of redundancy strategies.

Given the variation in system configurations and sizes of installations that Polistream can support there can never be a single redundancy scheme that will suit all cases, therefore here at Screen we use our experience and expertise to develop a strategy to suit your specific needs.

There are two areas which need to be considered, physical I/O redundancy and software component redundancy. In any system there will be a number of physical signal connections and there needs to be a scheme to handle the failure of any one of these.

Polistream's flexible redundancy strategy allows different schemes to be used for various parts of the system. N+N redundancy may be most suitable for either low cost inputs or mission critical sections while N+1 redundancy is best for high value keyers and inserters.


The redundancy options available are:


· None
· Cold standby spares
· N+1 with manual changeover
· N+1 with automatic changeover
· N+N with manual changeover
· N+N with automatic changeover
· N+N duplicate systems (complete duplicate system running in parallel)
· Separate Disaster Recovery (DR) sites


Polistream allows for any of these schemes but different strategies work best for specific areas of redundancy design.


See the example drawings on this page for more details and read the Polistream Redundancy Whitepaper for a more in depth explanation.












Contact Us

Top of page

Redundancy Strategies Whitepaper

Download


Polistream Input Signal Redundancy Diagram

Download

Enlarge


Polistream System Redundancy Diagram

Download

Enlarge


Polistream ASI Output Redundancy Diagram

Download

Enlarge


Polistream Output Signal Redundancy Diagram

Download

Enlarge